info@impactrubberflooring.co.uk 
Home About Us Samples Browse Products Technical Contact Us
sustainable_rubber_flooring

Sign up to our newsletter

 

 Rubber Flooring Installation

 

Ultimate impact Rubber  flooring can be laid easily and fast.

 

The rolls are laid, cut to the appropriate size and finally, depending on what they are being used for, laid down loose or in most cases fixed with an adhesive.

The sub floor does not require any special preparation, but should be treated in a convential manner and be flat and solid.

 

For ease of maintenance and cleaning, we recommend to seal the surface with a PU-sealer before it will be used for the first time.

 

Download the Installation Guide below

 

 Please Call 0800 567 7954 or fill in the enquiry form below
Name*:

Company*:

Email:

Phone Number*:

Comments:
     

 © 2009-2016 - Ultimate Impact, All Rights Reserved

 

 Home | About Us | Samples | Product Range | Colour Range | Technical | Terms & Conditions | Contact Us